top of page
blueprint.jpg

Permits

ADU Building Permits by
Experts in the Field

⦁    All Cost Included
⦁    No Hidden Cost
⦁    Cheaper than doing it yourself
⦁    Expedient Process
Includes:
⦁    Mortgage Acceleration Check
⦁    Title Check for,
Liens and Encumbrances

PERMIT APPLICATION OPTIONS

  • PRE-APP ANALYSIS

    1,500$
    Develop an understanding of your options
    Valid for 10 years
    • Site Specific ADU Qualification Summary
    • Site Specific Maximum and Minimum Square Footage Summary
    • Site Specific ADU Permit Issuance Timeframe
    • Site Specific list Easements that might conflict with my ADU
    • Site Specific list of Lien Holders who might object my ADU
  • APPLICATION

    7,000$
    Choose from your options and apply for your permits
    Valid for 10 years
    • Site Specific Site Inspection
    • Site Specific Site Analysis
    • Site Specific ADU Building Envelope
    • Site Specific ADU Maximum Height Summary
    • Site Specific Estimated Building Budget
    • Site Specific Connection Locations for Water, Power, and Sew
    • Site Specific Design Specs for my ADU
    • Approval of Permits
  • ANALYSIS & APP

    7,500$
    Expedite the process, apply for your dream
    Valid for 10 years
    • We guarantee the issuance of Garage Conversion Permit
    • Site Specific ADU Qualification Summary
    • Site Specific Maximum and Minimum Square Footage Summary
    • Site Specific ADU Permit Issuance Timeframe
    • Site Specific list Easements that might conflict with my ADU
    • Site Specific list of Lien Holders who might object my ADU
    • Site Specific Site Inspection
    • Site Specific Site Analysis
    • Site Specific ADU Building Envelope
    • Site Specific ADU Maximum Height Summary
    • Site Specific Estimated Building Budget
    • Site Specific Connection Locations - Water, Power, and Sewer
    • Site Specific Design Specs for my ADU
    • Approval of Permits
    • Issuance of Garage Conversion Permit
bottom of page